• ISSN 0258-2724
  • CN 51-1277/U
  • EI Compendex
  • Scopus 收录
  • 全国中文核心期刊
  • 中国科技论文统计源期刊
  • 中国科学引文数据库来源期刊

考虑几何非线性及施工的钢管混凝土拱桥徐变

武文杰,王元丰,马伊硕

downloadPDF
武文杰, 王元丰, 马伊硕. 考虑几何非线性及施工的钢管混凝土拱桥徐变[J]. 江南娱乐网页版入口官网下载安装学报, 2013, 26(4): 645-650. doi: 10.3969/j.issn.0258-2724.2013.04.009
引用本文: 武文杰, 王元丰, 马伊硕. 考虑几何非线性及施工的钢管混凝土拱桥徐变[J]. 江南娱乐网页版入口官网下载安装学报, 2013, 26(4): 645-650.doi:10.3969/j.issn.0258-2724.2013.04.009
WU Wenjie, WANG Yuanfeng, MA Yishuo. Creep of Concrete-Filled Steel Tube Arch Bridge Considering Geometric Nonlinearity and Construction[J]. Journal of Southwest Jiaotong University, 2013, 26(4): 645-650. doi: 10.3969/j.issn.0258-2724.2013.04.009
Citation: WU Wenjie, WANG Yuanfeng, MA Yishuo. Creep of Concrete-Filled Steel Tube Arch Bridge Considering Geometric Nonlinearity and Construction[J].Journal of Southwest Jiaotong University, 2013, 26(4): 645-650.doi:10.3969/j.issn.0258-2724.2013.04.009

考虑几何非线性及施工的钢管混凝土拱桥徐变

doi:10.3969/j.issn.0258-2724.2013.04.009
基金项目:

国家自然科学基金资助项目(50778020)

Creep of Concrete-Filled Steel Tube Arch Bridge Considering Geometric Nonlinearity and Construction

    • 摘要:为研究大跨度钢管混凝土拱桥的徐变行为,基于混凝土徐变的B3模型,采用结构徐变效应分析的龄期调整有效模量法,建立了结构徐变的有限元分析模型.在此基础上,基于协同转动法考虑大跨度结构的几何非线性;利用生死单元技术模拟拱桥的分阶段施工过程;最后结合某大跨度中承式钢管混凝土拱桥,分析了考虑几何非线性和施工过程的徐变效应.数值分析表明:考虑这两个因素后拱肋挠度、钢管应力的变化在10%以内,而拱肋混凝土应力的变化可达50%;在分析大跨度钢管混凝土拱桥的徐变效应时,必须考虑几何非线性及施工过程与徐变的耦合作用.

    • NAKAMURA S. New structural forms for steel/concrete composite bridges[J]. Structural Engineering Interna-tional, 2000, 10(1): 45-50.
      钟善桐. 钢管混凝土结构[M]. 北京:清华大学出版社,2003: 1-5.
      DING D J. Development of concrete-filled tubular arch bridges, China[J]. Structural Engineering Interna-tional, 2001, 11(4): 265-267.
      陈宝春. 钢管混凝土拱桥设计与施工[M]. 北京:人民交通出版社,2007: 4-8.
      SHAO Xudong, PENG Jianxin, LI Lifeng, et al. Time-dependent behavior of concrete-filled steel tubular arch bridge[J]. Journal of Bridge Engineering, 2010, 15(1): 98-107.
      WANG Yuanfeng, HAN Bing, ZHANG Dianjie. Advances in creep of concrete filled steel tube members and structures[C]//Proceedings of 8th Concreep Conference. Ise-Shima: Taylor & Francis Group, 2008: 595-600.
      马伊硕. 徐变对大跨度钢管混凝土拱桥静力及动力可靠性的影响研究[D]. 北京:北京交通大学,2013.
      WANG Yuyin, GENG Yue, RANZI G, et al. Time-dependent behaviour of expansive concrete-filled steel tubular columns[J]. Journal of Constructional Steel Research, 2011, 67(3): 471-483.
      PI Yonglin, BRADFORD M A, QU Weilian. Long-term non-linear behaviour and buckling of shallow concrete-filled steel tubular arches[J]. International Journal of Non-Linear Mechanics, 2011, 46(9): 1155-1166.
      THAI H T, KIM S E. Nonlinear inelastic analysis of concrete-filled steel tubular frames[J]. Journal of Constructional Steel Research, 2011, 67(12): 1797-1805.
      BAŽANT Z P, BAWEJA S. Creep and shrinkage prediction model for analysis and design of concrete structures: model B3[C]//Adam Neville Symposium: Creep and Shrinkage-Structural Design Effects.[S.l]: American Concrete Institute, 2000: 1-83.
      BAŽANT Z P. Prediction of concrete creep effects using age-adjusted effective modulus method[J]. Journal of American Concrete Institute, 1972, 69(20): 212-217.
      RANKIN C C, BROGAN F A. An element independent corotational procedure for the treatment of large rotations[J]. Journal of Pressure Vessel Technology, 1986, 108(2): 165-174.
      NOUR-OMID B, RANKIN C C. Finite rotation analysis and consistent linearization using projectors[J]. Computer Methods in Applied Mechanics and Engineering, 1991, 93(3): 353-384.
      FELIPPA C A, HAUGEN B. A unified formulation of small-strain corotational finite elements: Ⅰ. theory[J]. Computer Methods in Applied Mechanics and Engineering, 2005, 194(21-24): 2285-2335.
      MALVERN L. Introduction to the mechanics of a montinuous medium[M]. New York: Prentice Hall, 1969: 497-569.
      辛兵,徐升桥. 大跨度钢管混凝土拱桥的徐变分析[J]. 铁道标准设计,2003(4): 31-33. XIN Bing, XU Shengqiao. Analysis of creepage of long span steel tubular concrete arch bridge[J]. Railway Standard Design, 2003(4): 31-33.
    • 加载中
    计量
    • 文章访问数:1549
    • HTML全文浏览量:110
    • PDF下载量:374
    • 被引次数:0
    出版历程
    • 收稿日期:2013-05-23
    • 刊出日期:2013-08-25

    目录

      /

        返回文章
        返回
          Baidu
          map